Fluorocarbon paint for construction
Key Performance Features
★ Excellent adhesion
★ Excellent weather resistance
★ Excellent light and colour retention
★ Excellent self-cleaning and scrub resistance
Construction parameters
Surface treatment | dry, clean, levelling |
Matching primer | primer of our company. |
Kinds and amount of curing agent | curing agent, paint: curing agent = 10:1. |
Diluent species and dosage | diluent, according to the paint volume of 20% -50% added |
Matching oil putty | putty of our company. |
Application period (25℃) | 4 hours |
Recoating time interval (25℃) | ≥30 minutes |
Suggested number of coats | two, total thickness about 60um |
Theoretical coating rate (40um ) | 6-8m2/L |
Relative humidity | <80% |
Packing | Paint 20L/bucket, hardener 4L/bucket, thinner 4L/bucket. |
Shelf life | 12 months |
Product Specifications
Color | Product Form | MOQ | Size | Volume /(M/L/S size) | Weight/ can | OEM/ODM | Packing size/ paper carton | Delivery Date |
Series color/ OEM | Liquid | 500kg | M cans: Height: 190mm, Diameter: 158mm, Perimeter: 500mm,(0.28x 0.5x 0.195) Square tank: Height: 256mm, Length: 169mm, Width: 106mm,(0.28x 0.514x 0.26) L can: Height: 370mm, Diameter: 282mm, Perimeter: 853mm,(0.38x 0.853x 0.39) |
M cans: 0.0273 cubic meters Square tank: 0.0374 cubic meters L can: 0.1264 cubic meters |
3.5kg/ 20kg | customized accept | 355*355*210 | Stocked item: 3~7 working-days Customized item: 7~20 working days |
Precautions
1. Should be sealed in a cool and dry place for storage, waterproof, leak-proof, sun-proof, high temperature-proof, away from sources of ignition.
2. After opening the can, it should be fully stirred, and the remaining paint at the bottom of the can should be washed with thinner and added to the paint mixing can to prevent the pigment from sinking to the bottom and causing colour difference.
3. After mixing evenly, use filter to remove impurities that may be mixed in.
4. Keep the construction site free of dust and maintain a well-ventilated environment.
5. Please strictly follow the construction process for painting construction.
6. Because the paint application period is 8 hours, so the construction should be based on the day of the required amount of mixing, within 8 hours to use up, so as to avoid waste!
Technical indicators
Condition in container | homogeneous state after mixing, no hard lumps |
Constructability | no obstacle for two coats |
Drying time | 2 hours |
Water resistance | 168 hours without any abnormality |
Resistance to 5% NaOH (m/m) | 48 hours without any abnormality. |
Resistant to 5% H2SO4 (v/v) | 168 hours without any abnormality. |
Scrub resistance (times) | >20,000 times |
Stain resistance (white and light colour), % | ≤10 |
Salt spray resistance | 2000 hours without change |
Resistance to artificial accelerated aging | 5000 hours without chalking, blistering, cracking, peeling |
Solvent wiping resistance (times) | 100 times |
Resistance to humidity and heat cycle (10 times) | no abnormality |