page_head_banner

Solutions

Alkyd Reddish Anti-corrosion Coating

Product also known as

  • Alkyd reddan antirust paint, alkyd reddan intermediate paint, alkyd reddan paint, alkyd reddan primer.

Basic parameters

Product English name  Alkyd red lead anticorrosive coatings
Dangerous Goods No.  33646
UN No.  1263
Organic solvent volatility  64 standard metre³.
Brand  Jinhui Coatings
Model  C52-3-3
Colour  Grey
Mixing ratio  Single component
Appearance  Smooth surface

Product composition

  • Alkyd reddan anticorrosive coating is a one-component anticorrosive coating composed of alkyd resin, reddan powder, antirust pigment and filler, additives, No.200 solvent gasoline and mixed solvents, and catalytic agent.

Properties

  • Paint film resistance to chalking, good protection performance, good light retention and colour retention, bright colour, good durability.
  • Strong adhesion, good mechanical properties.
  • Strong filling ability.
  • High pigment content, good sanding performance.
  • Good matching performance, good combination with alkyd top coat.
  • Tough paint film, good closure, excellent anti-rust performance, can withstand the impact of temperature difference.
  • Good construction performance.

Usage

  • Suitable for steel surface, machinery surface, pipeline surface, equipment surface, wood surface.
Alkyd-Reddish-Anti-corrosion-Coating-1

Technical parameters: GB/T 25251-2010

  • Status in the container: no hard lumps after stirring and mixing, in a homogeneous state
  • Adhesion: first class (standard index: GB/T1720-1979(89))
  • Fineness: ≤50um (standard index: GB/T6753.1-2007)
  • Salt water resistance: 3% NaCl, 48h without cracking, blistering, peeling (standard index: GB/T9274-88)
  • Drying time: surface drying ≤ 5h, solid drying ≤ 24h (standard index: GB/T1728-79)

Surface treatment

  • Steel surface sandblasting treatment to Sa2.5 grade, surface roughness 30um-75um.
  • Electrical tools rust removal to St3 grade.

Pre-painting matching

  • Paint directly on the surface of steel whose descaling quality reaches Sa2.5 grade.

Post-painting matching

  • Alkyd intermediate paint and alkyd paint.

Paint construction

  • Thinners: special thinners for alkyd series.
  • After opening the barrel, it must be stirred evenly, left to stand and mature for 30min, then add appropriate amount of thinner and adjust to the construction viscosity.
  • Airless spraying: the dilution amount is 0-5% (in the ratio of the weight of the paint), the nozzle calibre is 0.4mm-0.5mm, and the spraying pressure is 20MPa-25MPa (200kg/cm²-250kg/cm²).
  • Air spraying: Dilution amount is 10-15% (by weight ratio of paint), nozzle calibre is 1.5mm-2.0mm, spraying pressure is 0.3MPa-0.4MPa (3kg/cm²-4kg/cm²).
  • Roller coating: Dilution amount is 5-10% (by paint weight ratio)

Construction parameters

Recommended film thickness  60-80um 0@WHKZDFFDMC2SG)2U`9%]W.jpg
Recommended number of coats  2~3 coats
Storage temperature  -10~40°C
Construction temperature  5~40℃
Trial period  6h
Construction method  Brushing, air spraying, rolling can be used.
Theoretical dosage  about 120g/m² (based on 35um dry film, excluding loss).
Coating interval

 

 

 Substrate temperature ℃ 5-10 15-20 25-30
 Shorter interval h 48 24 12
 The longer interval should not exceed 7 days.
Substrate temperature must be more than 3℃ above the dew point, when the substrate temperature is lower than 5℃, the paint film will not be cured and should not be constructed.

Precautions

  • In the high temperature season construction, easy to dry spray, in order to avoid dry spray can be adjusted with thinner until not dry spray.
  • This product should be used by professional painting operators according to the instructions on the product package or this manual.
  • All coating and use of this product must be carried out in accordance with all relevant health, safety and environmental regulations and standards.
  • If in doubt as to whether or not to use this product, please contact our technical service department for details.

Packaging

  • 25kg drum

Transport Storage

  • The product should be stored in a cool and ventilated place, prevented from direct sunlight, and isolated from sources of ignition, away from heat sources in the warehouse.
  • When transporting the product, it should be prevented from rain, sunlight exposure, avoid collision, and should comply with the relevant regulations of the traffic department.

Safety Protection

  • The construction site should have good ventilation facilities, and painters should wear glasses, gloves, masks, etc. to avoid skin contact and inhalation of paint mist.
  • Smoking and fire are strictly prohibited at the construction site.