Alkyd Medium Coating

Product also known as

  • Alkyd ferro-alkali antirust paint, alkyd ferro-alkali intermediate paint, alkyd ferro-alkali anticorrosive coating, alkyd intermediate paint, alkyd ferro-alkali paint.

Basic parameters

Product English name  The alkyd coating
Dangerous Goods No.  33646
UN No.  1263
Organic solvent volatility  64 standard metre³.
Brand  Jinhui Coating
Model No.  C52-2-5
Colour  Grey
Mixing ratio  Single component
Appearance  Smooth surface

Product composition

  • Alkyd medium coating is composed of alkyd resin, mica iron oxide, antirust pigment filler, additives, No.200 solvent gasoline and mixed solvent, catalytic agent and so on.

Characteristics

  • Paint film anti-chalking, good protection performance, good light retention and colour retention, bright colour, good durability.
  • Paint film is tough, good sealing, excellent anti-rust performance, can withstand the impact of temperature difference.
  • Good matching performance, good combination with alkyd primer and alkyd top coat.
  • High pigment content, good sanding performance.
  • Strong adhesion, good mechanical properties.
  • Good construction performance.
  • Strong filling ability.
Alkyd-intermediate-paint-3

Packing

  • 25kg drum

Technical parameters: GB/T 25251-2010

  • Status in the container: no hard lumps after stirring and mixing, in a homogeneous state.
  • Adhesion: first class (standard index: GB/T1720-1979(89))
  • Fineness: ≤60um (standard index: GB/T6753.1-2007)
  • Salt water resistance: 3% NaCl, 48h without cracking, blistering, peeling (standard index: GB/T9274-88)
  • Drying time: surface drying ≤ 5h, solid drying ≤ 24h (standard index: GB/T1728-79)

Surface treatment

  • Steel surface sandblasting treatment to Sa2.5 grade, surface roughness 30um-75um.
  • Electrical tools descaling to St3 grade.

Front course matching

  • Directly painted on the surface of steel whose rust removal quality reaches Sa2.5 grade, or painted on the surface of alkyd primer.

Back course matching

  • Alkyd paint.

Construction parameters

Recommended film thickness  60-80um
Recommended number of coats  2~3 coats
Storage temperature  -10~40℃.
Construction temperature  5~40℃
Trial period  6h
Construction method  Brushing, air spraying, rolling can be used.
Theoretical dosage  about 120g/m² (based on 35um dry film, excluding loss).
Coating interval

  

 Substrate temperature ℃ 5-10 15-20 25-30
 Shorter interval h 48 24 12
 The longer interval should not exceed 7 days.
The substrate temperature must be more than 3℃ above the dew point. When the substrate temperature is lower than 5℃, the paint film will not be cured and is not suitable for construction.

Paint construction

  • After opening the barrel, it must be stirred evenly, left to stand and mature for 30min, then add appropriate amount of thinner and adjust to the construction viscosity.
  • Diluent: special diluent for alkyd series.
  • Airless spraying: Dilution amount is 0-5% (by weight ratio of paint), nozzle calibre is 0.4mm-0.5mm, spraying pressure is 20MPa-25MPa (200kg/cm²-250kg/cm²).
  • Air spraying: Dilution amount is 10-15% (by weight ratio of paint), nozzle calibre is 1.5mm-2.0mm, spraying pressure is 0.3MPa-0.4MPa (3kg/cm²-4kg/cm²).
  • Roller coating: Dilution amount is 5-10% (by paint weight ratio).

Usage

  • Suitable for steel surfaces, mechanical surfaces, pipeline surfaces, equipment surfaces, wood surfaces.
Alkyd-Medium-Coating-4

Note

Dry spraying is likely to occur during the hot season:

  • In the high temperature season construction, easy to dry spray, in order to avoid dry spray can be adjusted with thinner until not dry spray.
  • This product should be used by professional painting operators according to the instructions on the product package or this manual.
  • All coating and use of this product must be carried out in accordance with all relevant health, safety and environmental regulations and standards.
  • If in doubt as to whether this product should be used, please contact our technical service department for details.

Transport Storage

  • The product should be stored in a cool and ventilated place, protected from direct sunlight, and isolated from sources of ignition and kept away from heat sources in a warehouse.
  • Products should be protected from rain, sunlight and collision when transported, and should comply with the relevant regulations of the traffic department.

Safety Protection

  • The construction site should have good ventilation facilities, and painters should wear glasses, gloves, masks, etc. to avoid skin contact and inhalation of paint mist.
  • Smoking and fire are strictly prohibited at the construction site.