Product also known as
- Alkyd iron-cloud antirust paint, alkyd iron-cloud intermediate paint, alkyd iron-cloud paint, alkyd intermediate paint, alkyd intermediate paint.
Basic parameters
Product English name | Alkyd cloud iron anticorrosive coatings |
Dangerous Goods No. | 33646 |
UN No. | 1263 |
Organic solvent volatility | 64 standard metre³. |
Brand | Jinhui Coatings |
Model | C52-2-3 |
Colour | Grey |
Mixing ratio | Single component |
Appearance | Smooth surface |
Product composition
- Alkyd iron mica anticorrosion coating is a one-component anticorrosion coating composed of alkyd resin, mica iron oxide, antirust pigment filler, additives, No.200 solvent gasoline and mixed solvents, and catalytic agent.
Technical parameters: GB/T 25251-2010
- Status in the container: no hard lumps after stirring and mixing, in a homogeneous state.
- Adhesion: first class (standard index: GB/T1720-1979(89))
- Fineness: ≤60um (standard index: GB/T6753.1-2007)
- Salt water resistance: 3% NaCl, 48h without cracking, blistering, peeling (standard index: GB/T9274-88)
- Drying time: surface drying ≤ 5h, solid drying ≤ 24h (standard index: GB/T1728-79)
Characteristics
- The paint film is tough, good closure, excellent anti-rust performance, can withstand the impact of temperature difference.
- Strong filling ability.
- Good matching performance, good combination with alkyd primer and alkyd top coat.
- Good construction performance.
- Strong adhesion, good mechanical properties.
- High pigment content, good sanding performance.
- Paint film anti-chalking, good protection performance, good light and colour retention, bright colour, good durability.
Surface treatment
- Steel surface sandblasting treatment to Sa2.5 grade, surface roughness 30um-75um.
- Electrical tools descaling to St3 grade.
Usage
- Suitable for steel surface, machinery surface, pipeline surface, equipment surface, wood surface.
Painting construction
- After opening the barrel, it must be stirred evenly, left to stand, and after maturing for 30min, add appropriate amount of thinner and adjust to the construction viscosity.
- Diluent: special diluent for alkyd series.
- Airless spraying: Dilution amount is 0-5% (by weight ratio of paint), nozzle calibre is 0.4mm-0.5mm, spraying pressure is 20MPa-25MPa (200kg/cm²-250kg/cm²).
- Air spraying: Dilution amount is 10-15% (by weight ratio of paint), nozzle calibre is 1.5mm-2.0mm, spraying pressure is 0.3MPa-0.4MPa (3kg/cm²-4kg/cm²).
- Roller coating: Dilution amount is 5-10% (in terms of paint weight ratio).
Construction parameters
Recommended film thickness | 60-80um |
Theoretical dosage | about 120g/m² (based on 35um dry film, excluding loss) |
Recommended number of coats | 2~3 |
Storage temperature | -10~40℃ |
Construction temperature | 5~40℃. |
Trial period | 6h |
Construction method | Brushing, air spraying, rolling can be. |
Coating interval
|
Substrate temperature ℃ 5-10 15-20 25-30 |
Shorter interval h 48 24 12 | |
The longer interval should not exceed 7 days. | |
Substrate temperature must be more than 3℃ above the dew point. When the substrate temperature is lower than 5℃, the paint film will not be cured and should not be constructed. |
Precautions
- In the high temperature season construction, easy to dry spray, in order to avoid dry spray can be adjusted with thinner until not dry spray.
- This product should be used by professional painting operators according to the instructions on the product package or this manual.
- All coating and use of this product must be carried out in accordance with all relevant health, safety and environmental regulations and standards.
- If in doubt as to whether this product should be used, please contact our technical service department for details.
Transport storage
- The product should be stored in a cool and ventilated place, protected from direct sunlight, and isolated from sources of ignition and kept away from heat sources in a warehouse.
- Products should be protected from rain, sunlight and collision when transported, and should comply with the relevant regulations of the traffic department.
Safety Protection
- The construction site should have good ventilation facilities, and painters should wear glasses, gloves, masks, etc. to avoid skin contact and inhalation of paint mist.
- Smoking and fire are strictly prohibited at the construction site.