Fluorocarbon finish paint industrial fluorocarbon top coat anti-corrosive coating
Product Description
Fluorocarbon anti-corrosive paint is a two-component coating prepared by fluorocarbon resin, weather-resistant fillers, various auxiliaries, aliphatic isocyanate curing agent (HDI), etc. Excellent water and heat resistance, excellent resistance to chemical corrosion. Excellent resistance to aging, powdering and UV. Paint film hard, with impact resistance, wear resistance. Good adhesion, compact film structure, with good oil and solvent resistance. Has a very strong light and color retention, decorative good.
Fluorocarbon finish paint has strong adhesion, bright luster, excellent weather resistance, excellent corrosion and mildew resistance, excellent yellowing resistance, chemical stability, extremely high durability and UV resistance. The weather resistance can reach about 20 years without falling off, cracking, chalking, high coating hardness, excellent alkali resistance, acid resistance and water resistance.....
Fluorocarbon paint is applied to Machinery, chemical industry, aerospace, buildings, advanced instruments and equipment, vehicles Bridge, vehicle, military industry. The colors of the primer paint are gray,white and red. Its characteristics are corrosion resistance. The material is coating and the shape is liquid. The packaging size of the paint is 4kg-20kg.
Front matching: zinc-rich primer, epoxy primer, epoxy intermediate paint, etc.
The surface must be dry and clean before construction, free of any contaminants (grease, zinc salt, etc.)
Technical specification
Appearance of coat | The coating film is smooth and smooth | ||
Color | White and various national standard colors | ||
Drying time | Surface dry ≤1h (23°C) Dry ≤24 h(23°C) | ||
Fully cured | 5d (23℃) | ||
Ripening time | 15min | ||
Ratio | 5:1 (weight ratio) | ||
Adhesion | ≤1 level (grid method) | ||
Recommended coating number | two, dry film 80μm | ||
Density | about 1.1g/cm³ | ||
Re-coating interval | |||
Substrate temperature | 0℃ | 25℃ | 40℃ |
Time length | 16h | 6h | 3h |
Short time interval | 7d | ||
Reserve note | 1, coating after the coating, the former coating film should be dry, without any pollution. 2, should not be in rainy days, foggy days and relative humidity greater than 80% of the case. 3, before use, the tool should be cleaned with diluent to remove possible water. should be dry without any pollution |
Product Specifications
Color | Product Form | MOQ | Size | Volume /(M/L/S size) | Weight/ can | OEM/ODM | Packing size/ paper carton | Delivery Date |
Series color/ OEM | Liquid | 500kg | M cans: Height: 190mm, Diameter: 158mm, Perimeter: 500mm,(0.28x 0.5x 0.195) Square tank: Height: 256mm, Length: 169mm, Width: 106mm,(0.28x 0.514x 0.26) L can: Height: 370mm, Diameter: 282mm, Perimeter: 853mm,(0.38x 0.853x 0.39) |
M cans: 0.0273 cubic meters Square tank: 0.0374 cubic meters L can: 0.1264 cubic meters |
3.5kg/ 20kg | customized accept | 355*355*210 | Stocked item: 3~7 working-days Customized item: 7~20 working days |
Scope of application
Product features
Organic high temperature resistant paint is made of silicone resin, special high temperature resistant anti-corrosion pigment filler, additives, etc. Excellent heat resistance, good adhesion, oil resistance and solvent resistance. Dry at room temperature, drying speed is fast.
Coating method
Construction conditions: The substrate temperature must be higher than 3°C, outdoor construction substrate temperature, below 5°C, epoxy resin and curing agent curing reaction stop, should not be carried out construction.
Mixing: The A component should be stirred evenly before adding the B component (curing agent) to blend, stirring evenly at the bottom, it is recommended to use a power agitator.
Dilution: After the hook is fully matured, an appropriate amount of supporting diluent can be added, stirred evenly, and adjusted to the construction viscosity before use.
Safety measures
The construction site should have a good ventilation environment to prevent the inhalation of solvent gas and paint fog. Products should be kept away from heat sources, and smoking is strictly prohibited at the construction site.
Storage and packaging
Storage: must be stored in accordance with national regulations, the environment is dry, ventilated and cool, avoid high temperature and far from the fire source.
Storage period: 12 months, after the inspection should be used after qualified.